1
Total Mentions
1
Documents
0
Connected Entities
Organization referenced in documents
EFTA01366647
ensn capacity factor of 16% if the project generates above 16% capacity factor. t is arable to be paid at the prevailing merchant rate NPS 981 Our NPS Stir projects are compnsed of thee saes located in Pend Supentrun are Lorrain provinces n Thailand Each of the projects have a capacity of 6.0 MW, with a
No connected entities