EFTA02718716
ensive and =horough) work scope -> pour 330 =nbsp;4' x 4' concrete slabs (total area 5,280 sq =t) cost per pad = 150,000 / 330 = =54.55 they mention Town of PBI may =equire a drain system which will be additional cost =/span>total job cost 186,960 =/span> 2) Patios Pools Driveways work scope -> remove & =e
st expensive and thorough) work scope -> pour 330 4' x 4' concrete=slabs (total area 5,280 sq ft) cost per pad = 150,000 / 330 = 454.55 they mention Town of PBI may =equire a drain system which will be additional cost total job cost 186,960 2) Patios Pools Drivew=ys work scope => remove & replace 50 4' x 4