1
Total Mentions
1
Documents
0
Connected Entities
Organization referenced in documents
EFTA00591377
arge man-hole behind Engineering. Excavation by LSJ. *Install new 3" conduit from large man-hole to existing Transformer Disconnect Switch outside Engineering Office. *Re-install existing feeder wire for Heli-pad and Gym thru 3'x3' man-hole to large man-hole and into existing engineering panel for Heli-pad and t
No connected entities