nd adhere to an FF&E installation schedule which schedule shall coordinate the timing and sequencing of the installation of FF&E in accordance with Contractor's Construction Schedule; Clear and remove all rubbish and packing materials accumulated as a result of the installation to a designated location on the job site. Provide s