smission, a pudic company that owns the national electric network The PPA executed between the generators and distributors must be registered before the National Grid, after receiving approval by Ministry of Energy and teatime and the Nicaraguan Energy Institute. Parties nterested sin estatlishrg wax, energy proj
EFTA02700742
Profile • Investment Grade • MISSION POWER EFTA_R1_02067897 EFTA02700756 as, Project Summa Expected COD: IVO 2013 • IQ 2014 Distance to the National Grid: •In the park" • Expected Project Cost: US$ 1.8 MM per MW or approximately US$ 180 MM • Expected Leverage: 80% • Equity Investment: US$ 38 MM (