1
Total Mentions
1
Documents
0
Connected Entities
Organization referenced in documents
EFTA02501618
the preliminary design so that you can get pricing. The permit itself wil= take about 60 days to be approved. The other two structures on top of the=R.O. and Generator Buildings will be done as permit modifications. Once yo= get the modification form signed by Mr. Epstein, we can file that. It wil= take approximately 2 — 3 w
No connected entities