1
Total Mentions
1
Documents
0
Connected Entities
Organization referenced in documents
EFTA01734227
tions Resolution: Sanded and primed R/II ground spoiler that had paint missing, removed light corrosion ,treated and primed and painted as required IAW GAC Gamps 4000. Billing Method Flours Rate rola Labor USD: Time and Material ST 4.75 @ S115.011 $546.25 Total USD: $546.25 For detail description of t
No connected entities