1
Total Mentions
1
Documents
0
Connected Entities
Organization referenced in documents
EFTA01734227
bor USD: Flat Rate Total USD: Hours Rate Thal $1,150.00 $1,150.00 Step: 8.15.1 Completed Removed and blend out light surface corrosion from the R/H Flap, upper surface around 44 track, Treated bare metal. and spot primer as required. IAW. SRM.S1-13.20. Discrepancy: 8.16 R/H wing flap outbd Yoke is
No connected entities