3
Total Mentions
3
Documents
3
Connected Entities
Name reference in documents
EFTA02621129
ive an update on the status of the pool. The plaster work went=very well , however in the acid wash and power washing of prep=ration of putting the Kristacure ( sealer ) we felt that the pool would be=efit from being filled few weeks .( This is the nor=al start up procedure ) During this time have Smiley b
EFTA02621143
e on the status of =he pool. The plaster work went very well , however in =he acid wash and power washing of the pool in preparation of putting =he Kristacure ( sealer ) we felt that the pool would benefit from being =illed with water first for a few weeks.( This is the normal start up =rocedure ) During t
EFTA02622473
e on the status of =he pool. The plaster work went very well , however in =he acid wash and power washing of the pool in preparation of putting =he Kristacure ( sealer ) we felt that the pool would benefit from being =illed with water first for a few weeks .( This is the normal start up =rocedure ) During