1
Total Mentions
1
Documents
0
Connected Entities
Organization referenced in documents
EFTA02451635
ter Services) for the refurbishment of the SW RO =n LS1 As shown there are= Immediate Repairs required Replacement of Control Panels, 75 hp =otor, Pump and Media filter service. This is outside of any work TSG have already been ap=roved for. At this time the RO is operational, but=failure of any of the above
No connected entities