1
Total Mentions
1
Documents
0
Connected Entities
Organization referenced in documents
EFTA02443952
ng upgrade that was not finished at FTC. I. Terminate existing Cat6 infrastructure and install wall faceplates. $2500.00 2. Install and configure Adtran VoIP Solution $23450.00 3. Travel and accommodations from NM (approximate) a. Items 2 and 3 are combined in the ValComm Quote for FTC. $7931.28 4. TOTAL $338
No connected entities