1
Total Mentions
1
Documents
0
Connected Entities
Name reference in documents
EFTA02605370
k we shoul= look into pour breaks to prevent EB from getting overwhelmed trying to po=r 100 yards in one day. If their are any issues with Barges on pour-=ay we will have non-structural pour breaks that will result in major crack=ng. Maybe do (3) 34 yard pours on separate days. To join the s=parate sectio
No connected entities