1
Total Mentions
1
Documents
0
Connected Entities
Organization referenced in documents
EFTA02309354
I'm having all the materials delivered on Tuesday to the building, they sa=d curbside delivery. It will be the wall and floor tiles, grout, toilet, va=ity, sink fixture and shower fixtures. (still looking for actual sink top, m=d cabinet and towel bar). How should they proceed with delivering the items
No connected entities