1
Total Mentions
1
Documents
0
Connected Entities
Name reference in documents
EFTA02409028
Do List Outstanding Issues: I .Ceiling Treatment: Ion working 2. Cabinet finishes 3. Floor finishes — open issue Master Suite: Status Interior I. Thassos starting 9/20 takes 2 months(11/20) 2. Wood floors 11/20 to 12/20 3. Occupy 1/20 Outstanding Issues I.out side shower will mock up for next visi
No connected entities