2
Total Mentions
2
Documents
3
Connected Entities
Organization referenced in documents
EFTA00679117
o buildings that we are creating. That space is entirely concrete. The footprint of space being built out is approximately 10,200 SF. If you include the Buck Steel quotes with the estimate, you end up with a total cost of $744,345.00 or approximately $73.00/SF. This is a very fair cost for the amount of square
EFTA02655828
o buildings that we are creating. That space is entirely concret=. The footprint of space being built out is approximately 10,200 SF. If yo= include the Buck Steel quotes with the estimate, you end up with a total =ost of $744,345.00 or approximately $73.00/SF. This is a very fair cost fo= the amount of square