1
Total Mentions
1
Documents
0
Connected Entities
Organization referenced in documents
EFTA00618062
l for woe k performe I and completed with 2 men €u 5400 per day for 4/15, 4/20.4/22 I 4/15 — Batch I 2 men My helper and i located 1.5- pipe above RO/Gen building that we ran to lower tank / I plant I area. We installed 80' of 1.5", 100' of r• and 60' of K". The shut off valve is located 1 where
No connected entities