1
Total Mentions
1
Documents
0
Connected Entities
Name reference in documents
EFTA00616691
e pre lineal foot for labor and materials of $15 is fair and reasonable. 2. The second item, $1952 for the gate valve, was for a valve requested by Dan and Aaran for handling current and future needs more efficiently; it was not part of the original package and is needed for the permanent system which is in
No connected entities