2
Total Mentions
2
Documents
1
Connected Entities
Organization referenced in documents
EFTA00258636
ES MUST BE PROVIDED WITH READILY ACCESSIBLE STOPS AND APPREPPJATELY MARKED ACCESS PANELS COORDINATE LOCATIONS WITH THE GENERAL CONTRACTOR PRIOR TO INSTAUATION DIALECTIC COUCUNGS ME REQUIRED BETWEEN AU. CHSSIRRAR METAL IN PIPING MD EQUIPMENT CONNECTIONS. CONTRACTOR SNAIL GUARANTEE ALL MATERIALS AND WORKMA
EFTA00616626
BRACKET, FUEL. FELTS/ SS SPIN ON GAS FILTER OMC 4 16 16 1 1 AMOUNT $13,941.00 $264.92' $40.00 140.00 $55.00 $12.80 X DISCOUNT $0.00 INSTAUATION/LABOR 11,700.00 RIGGING SUPPLIES $0.00 QUOTE TOTAL $16,053.72 Qui; TED PRICE IS FOR MOTOR AND INSTALLATION_ ANY ADDITIONAL PARIS( BATTERY ETC.)