1
Total Mentions
1
Documents
0
Connected Entities
Organization referenced in documents
EFTA00799032
with the replacement of windows on the 5th floor (1 door leading to the roof and 2 windows) according to the attached quote dated May 17", 2017 from T.P.L. amounting to 9,544.70 E. Decision to be made. 12. Installation of a water meters In order to control water consumption in the building, decision
No connected entities