1
Total Mentions
1
Documents
0
Connected Entities
Location referenced in documents
EFTA00614108
above pre-war levels in the future, he said. Before the conflict. Agoco had begun drilling wells in the Sultan area south of Benghazi linked to the Zuetina export terminal, which he said had the potential to pump 50,000 bpd. First output from these fields was originally planned for 2012. Agoco, formed
No connected entities