1
Total Mentions
1
Documents
0
Connected Entities
Organization referenced in documents
EFTA00612473
Item Description Quantity Cost Estimate Total Labour and Material Labour and Material for Topside, Deck and cabin house 5,400.00 5,400.00 Topside Paint job include 1.Grind out bad Spots 2.Fill where needed with west System Epoxy 407 tiller 3.Sand and Fair area 4.Sand intire topside 5.Tape amd M
No connected entities