1
Total Mentions
1
Documents
0
Connected Entities
Organization referenced in documents
EFTA00870583
se work has been completed. The nonrefundable 15k was paid as a portion of the Conceptual / Schematic Design Phase so an additional 5k plus half of the Design Development Phase, 10k. A total of 15k is owed to me for work completed. Please have check cut and sent to the address below. You have all information that is require
No connected entities