1
Total Mentions
1
Documents
0
Connected Entities
Organization referenced in documents
EFTA00870583
al / Schematic Design Phase as well as half of the Design Development Phase work has been completed. The nonrefundable 15k was paid as a portion of the Conceptual / Schematic Design Phase so an additional 5k plus half of the Design Development Phase, 10k. A total of 15k is owed to me for work completed. Please have check cut and sent
No connected entities