EFTA00694555
ld use part of the old Trust Asset office as opposed to setting up on GSJ but, with no generator power, it makes no sense. WAPA contractors are in the Red Hook/Nazareth area but when I asked if the knew when RH would be energized, they did not have a guess. I've reached out to Greg Rhymer of WAPA since there has not
EFTA02623214
uld use part of the old Trust Asset office as oppose= to setting up on GSJ but, with no generator power, it makes no sense. WAPA contractors are in the Red Hook/Nazareth area but when I asked if the k=ew when RH would be energized, they did not have a guess. I've reached out=to Greg Rhymer of WAPA since there has not