3
Total Mentions
3
Documents
3
Connected Entities
Location referenced in documents
EFTA00847292
e are photos showing the grade stake (GS) at the NE Corner As shown on sketch from Tim Oden the required amount of fill is 9"4" to meet grade at the NW Corner closet to MH The Plan would be to use a lot of rocks and lose rock material for first stage of fill and then top off with 4 to 5 feet of compacted d
EFTA02704799
e are photos showing=the grade stake (GS) at the NE Corner As shown on sketch from Tim Oden the required=amount of fill is 9"4" to meet grade at the NW Corner closet to =H The Plan would be to u=e a lot of rocks and lose rock material for first stage of fill and then t=p off with 4 to 5 feet of compacted
EFTA02490604
e are photos showing the=grade stake (GS) at the NE Corner As shown on sketch from Tim Oden the required amo=nt of fill is 9"4" to meet grade at the NW Corner closet to MHc/=iv> The Plan would be to use a=lot of rocks and lose rock material for first stage of fill and then top o=f with 4 to 5 feet of com