1
Total Mentions
1
Documents
0
Connected Entities
Organization referenced in documents
EFTA00128758
from approximately 1990 through 2015. From 1990 until 2004 he was in charge of mapping the power lines and water mains for WAPA. In 2005 he became a Staking Engineer where his duties became surveying of new construction sites, determining where new electrical meters were to be installed, and how the power lines
No connected entities