1
Total Mentions
1
Documents
0
Connected Entities
Name reference in documents
EFTA00835018
designed and built for the final build out plant. The intake pipe and screen were installed under the main dock by affixing it to the dock pilings. Valving was installed at the container to allow the seawater pipes to be extended to the main maintenance facility that was under consideration at that tim
No connected entities