EFTA01303089
d by Owner) Excavate & Pour 8 New Column Footings Form & Pour 8 New Columns Form & Pour Bond Beam (Alt. Steel Beam Acceptable) Strip & Remove All Formwork Frame Roof with 3"x8" rafters & 3"x10" hips 4/12 Pitch Install 2"x12" Fascia Board Around Roof Perimeter Install One Layer of 3/4" PT Plywood Deck
EFTA01340681
d by Owner) Excavate & Pour 8 New Column Footings Form & Pour 8 New Columns Form & Pour Bond Beam (Alt. Steel Beam Acceptable) Strip & Remove All Formwork Frame Roof with 3"x8" rafters & 3"x10" hips 4/12 Pitch Install 2"x12" Fascia Board Around Roof Perimeter Install One Layer of 3/4" PT Plywood Deck
EFTA00727848
.00 03-112 FPS Walls - L 135 cyd $200.00 $0.00 $0.00 $27,000.00 03-130 5000# Concrete _ 299 cyd $176.00 $0.00 $0.00_ $52,624.00 03-150 Formwork — 1 — Tot $3,500.00 $0.00 $0.00 $3,500.00 03-173 Slabs on Grade - L 3600 — sft $7.00 $0.00 $0.00 $25,200.00 03-178 Vapor Barrier - L

Oliver Stone
PersonAmerican film director, screenwriter, and producer (born 1946)
Barge
PersonNER artifact - references to barge operations at Epstein properties
Excavate & Pour 8
OrganizationOrganization referenced in documents
Strip & Remove
OrganizationOrganization referenced in documents
Concrete Columns & Beams
OrganizationOrganization referenced in documents