1
Total Mentions
1
Documents
0
Connected Entities
Location referenced in documents
EFTA00811104
2019 additional additional work omit cabinet and countertop allowances Frame larger opening for larger tub in master bath no change Switch tub in bath2 for shower only no change Terms- 1/3 down ($29,107.67) to start. All repairs done, electrical rough-in done, walls and ceilings repaired and painte
No connected entities