EFTA00287140
rogress. ■ Main House Chiller #1 old Carrier needs to be up graded to high efficiency chiller to meet the new load demands of the building. Called AD Winston to start the engineering of chiller #1 re lacement. JE will call AD Winston Mauro Palladino at for details of project. EFTA00287142 ■ Otis Ele
EFTA00675348
having Simply Elegant to return 11/25, will finish 11/26. Also per your direction, Simply Elegant to be onsite again on 12/9 to open up ceiling for AD Winston to begin on 12/9. Wifi- Had Scott over to reestablish wifi on first floor, checked all of your areas you frequent as well- all working. Fire alarm
EFTA00304462
■ Repair or replace steam bypass valve AC- 2 ■ Get proposal for SCU - upgrade Landis/Siemens ■ Finish painting cooling tower steel on roof have AD Winston install new bearings on outboard side of cooling tower. ■ Purchase Heating pump microcontroller or contactor panel for heating pump #6. ■ Condu
EFTA00555369
21:35:44 +0000 Forwarded message From: Merwin Dela cruz Date: Mon, Jun 10, 2019 at 4:47 PM Subject: Re: To: J <[email protected]> Hi sir, AD Winston is coming on Wednesday to see if they can somehow eliminate or dampen the a/c noise, I did not get the chance to work on the lock yet and stove is a
EFTA00636799
EDT To: Jeffrey Epstein Cc: Rich Bamett Attached is report from Alan Schwartz - Engineer that previously worked at 9 East 71st Street I will have AD Winston price Allan's recommendations Next email is quote from Stanley Berger on proposed Mitsubishi unit costing $97,925 Please advise Richard Kahn HBRK
EFTA00709290
ystem I will forward all proposals. The following is a list of contact information Sorce One Louis Schoen , Siemens Steven Driver Bradley Richert AD Winston. Mauro Palladino Leonard Powers I hope this helps on making decisions on proposal approvals to move orwar on this project .Richard Barnett. EFTA
EFTA00585861
rogress. ■ Main House Chiller #1 old Carrier needs to be up graded to high efficiency chiller to meet the new load demands of the building. Called AD Winston to start the engineering of hill r #1 re lacement. JE will call AD Winston Mauro Palladino at for details of project. EFTA00585863 ■ Otis Elev
EFTA00585865
progress. • Main House Chiller #1 old Carrier needs to be up graded to high efficiency chiller to meet the new load demands of the building. Called AD Winston to start the engineering •• acement. JE will call AD Winston Mauro Palladino at or details of project. EFTA00585867 ■ Otis Elevator exhaust fa
EFTA00587296
ndors Police: 19th Precinct ADT Central Station (Alarm) Smoke Alarm Sprinkler Alarm Otis Elevator Con Edison Siemens (Computer) Glass Repair AD Winston (HVAC) IFL Movers G&G Duct Cleaning Premier (Wait staff/Bartenders) DJM Window Washers Herbert Rose (Water Proof/Leaks) Alcon Lock Smiths (Tony
EFTA01961881
eevacation mail.com> Cc: Rich Barnett Attached is report from Alan Schwartz - Engineer that previously worked at 9 East 7Ist Street I will have AD Winston price Allan's recommendations Next email is quote from Stanley Berger on proposed Mitsubishi unit costing 597,925 Please advise Richard Kahn HBRK
EFTA01961973
7/29/2013 6:41:22 PM 072513e71streot.odf Attached is report from Alan Schwartz - Engineer that previously worked at 9 East 71st Strcct I will have AD Winston price Allan's recommendations Next email is quote from Stanley Berger on proposed Mitsubishi unit costing $97,925 Please advise Richard Kahn HBRK
EFTA01833342
forward the full energy report and recommendations for system up grades will be complete by 1/25/11 i am also waiting on Pricing for up grades that AD Winston is working on for free cooling & removal of the old Carrier Chiller and adding the additional 25 tons of compressors to the new Air stack Chiller.
EFTA01739000
n as requested to get the two HVAC contractors bidding the Chiller and Cooling Tower up grade project the same scope of work bids to compare pricing.AD Winston came in with a complete bid package with electrical connections and property protection included in their proposal at $357,255.00 .Pierpont Mechani
EFTA02679479
7:49 PM To: Jeffrey Epstein Subject: Fwd: contact info Attachments: Epstein Residence.pdf; Untitled attachment 00965.htm i =ave two calls into AD Winston to review bid and your =oncerns attached is breakdown of costs from last July when job was =riginally bid please advise Richard Kahn HBRK Associat
EFTA02679570
mately 10 years. The cost for this =xtra is 22,656. http:/=hpac.com/motors-drives/benefits-vfds-cooling-towers Please advise if ok to proceed with AD Winston. =nbsp; Option 1 - ADW and no VFD 350,000 - =16,666.67 deposit required Option 2 - ADW and =FD 372,656 - 124,218.67 deposit =equired EFTA_R1_01983
EFTA02535515
for=ard the full energy report and recommendations for system up grades will=be complete by 1/25/11 i am also waiting on Pricing for up grades that AD Winston is working on for free cooling & removal of the old Carr=er Chiller and adding the additional 25 tons of compressors to the ne= Air stack Chiller. I
EFTA02408981
ns change out of control panels for all HVAC operation. / Get price meeting set for December 6th • Finish painting cooling tower steel on roof have AD Winston install new bearings on outboard side of cooling tower. One tower replaced outboard bearing by AD Winston. • Purchase Heating pump microcontroller
EFTA02699861
:17 PM To: Je vacation Subject: Fwd: contact info Attachments: Epstein Residence.pdf; Untitled attachment 00028.htm attached is best breakdown AD Winston was able to provide on =onday i will obtain breakdown on costs of Chiller standalone in =ddition to Cooling Towers standalone i also think we should
EFTA02724925
d Kahn Sent: Mon 7/29/2013 6:41:22 PM 072513e71streot.odf Attached is report from Alan Schwartz - Engineer that previously worked al I will have AD Winston price Allan's recommendations Next email is quote from Stanley Berger on proposed Mitsubishi unit costing $97,925 Please advise Richard Kahn or HB
EFTA02314881
: Merwin Dela cruz ></=pan> Date: Mon, Jun 10, 2019 at 4:47 PM Subject: Re: To: J <[email protected] <mailto:[email protected]» Hi sir, AD Winston is coming on Wednesday to see if they can somehow el=minate or dampen the a/c noise, I did not get the chance to work on the lo=k yet and stove is a

Jeffrey Epstein
PersonAmerican sex offender and financier (1953–2019)

Marc Rich
PersonAmerican commodities trader (1934–2013)

Richard Kahn
PersonJeffrey Epstein's accountant and estate co-executor (2005-present)
Richard Barnett
PersonIndividual referenced in Epstein documents

Alan Dershowitz
PersonAmerican lawyer, author, and art collector (born 1938)
Michael Palladino
PersonPerson referenced in documents
Alan Schwartz
PersonPerson referenced in documents
Mitsubishi
OrganizationJapanese multinational corporation
Stanley Berger
PersonPerson referenced in documents
Chiller
OrganizationOrganization referenced in documents
Alan R Schwartz PE Consulting Engineers
OrganizationOrganization referenced in documents

Glass
PersonSurname reference in Epstein documents
Merwin Dela Cruz
PersonEpstein building maintenance and property staff member (full name: Merwin Dela Cruz)

Siemens
OrganizationGerman multinational conglomerate company
Alan Schwartz - Engineer
PersonName reference in documents
3rd fl.
LocationLocation referenced in documents
Darren Indyke
PersonAmerican lawyer, longtime personal attorney and co-executor of Jeffrey Epstein's estate

Ghislaine Maxwell
PersonBritish socialite and sex trafficker, daughter of Robert Maxwell, accomplice of Jeffrey Epstein
Sawyers
OrganizationOrganization referenced in documents

Sarah Kellen
PersonAmerican assistant to Jeffrey Epstein, named as unindicted co-conspirator in 2008 non-prosecution agreement