1
Total Mentions
1
Documents
0
Connected Entities
Organization referenced in documents
EFTA00810922
ting from the date of receiving the Letter of Award) 6. EXCLUSIONS The following items are excluded from this proposal: 1. Feasibility Studies 2. Engineering Design Full Services (MEP, Structure, etc....) 3. Specialized work like Security, Audio Visual, Environmental, Geotechnical, Topographic Surveys, etc 4. Site Surveys 5
No connected entities