1
Total Mentions
1
Documents
0
Connected Entities
Organization referenced in documents
EFTA00810922
ntioned in above. 5. PROJECT PROPOSED DESIGN TIME SCHEDULE • 1 Week Mobilization • 3 Months design schedule (starting from the date of receiving the Letter of Award) 6. EXCLUSIONS The following items are excluded from this proposal: 1. Feasibility Studies 2. Engineering Design Full Services (MEP, Structure, e
No connected entities