1
Total Mentions
1
Documents
0
Connected Entities
Name reference in documents
EFTA00805202
ESTIMATION 26.15 3 MONTHS FORME DETAILED DESIGNED 26.14 26.17 ____ 12 moms FOR CONSRUCTION (TO BE DISCUSSED) 26.18 26.19 ire coneactor should WM Me site and obtainnecessary Inhumations for pricing end al quonthes are to be checked and ratified Fully. 26 Contractor ore fully responsible lot des
No connected entities