2
Total Mentions
2
Documents
3
Connected Entities
Organization referenced in documents
EFTA00805202
MOSAIC DIES - Supply and Indollealon - C Stone mosaic ties/OTHERS 145 PA2 142503 235425.03 64,554.79 IF TOTAL CARRIED TO SUMMARY • WALLS 4 PARTMON WORKS t FINISHES 6,613,81500 1,812,034.11 7.00 CEILING WORKS 4 MIMES 7.03 7.06 SUSPENDED GYPSUMCEILING Supply and installation Cl suspended gypsum
EFTA00617393
TURE a ROOF WORKS 11,570800.00 3,170,000.00 3.00 MEP WORKS 8.091.541.12 2.216240.58 4.00 SOUND SYSTEM 187.20000 51287.67 • 6.00 WALLS 2. PARTMON WORKS 3 FINISHES 6.117.150.00 1,675,931.51 • 7.00 CEILING WORKS L FINISHES 758.55000 207,821.92 goo FLOOR WORKS 6 FINISHES 5.199.350.00 1,424,47