1
Total Mentions
1
Documents
0
Connected Entities
Organization referenced in documents
EFTA00609249
Drilling crew and equipment I day $2,000.00 52,000.00 Mobilization, including airfare and soil shipping• I lump sum $1,500.00 $1,500.00 Field Engineering I day $800.00 $800.00 Engineering time for report preparation 20 hp, $125.00 $2,500.00 Estimated Total Costs $6,800.00 EFTA00609252
No connected entities