1
Total Mentions
1
Documents
0
Connected Entities
Organization referenced in documents
EFTA00802886
ish, with bar sink and faucet. Install New Roof Decking and Pick up points Finish Ceiling in T&G Cedar. Install Dura Rock Subfloor and Finish with Rustic Grey floor tile Install New Cabinets Refinish Bar Seat with Hardwood in a High Gloss Finish Duration: 23 days, 2 Men GSI Sea Water Intake Shed Scope
No connected entities