1
Total Mentions
1
Documents
0
Connected Entities
Organization referenced in documents
EFTA00600290
MASTER 1. Walls and ceiling painted. 2. Floor leveler applied. 3. Floor underlayment down prepared for wood flooring. 4. Thassos going on walls S. Coral laid up to shower, patched around columns COTTAGES 1. Roofs painted 2. Cabinets set tops on 3. Ion painting walls I 4. Doors and shutters comple
No connected entities