thank you</=> Richard Kahn Begin forwarded message: <=iv style="margin-top:0px;margin-ri ht:0 rmar in-bottom:0 x•margin- left:=px">From: Richard Ka=n <[email protected] <mailt Subject: FW: Zorro Ranch / CenturyLink Quote</=> Date: April 25, 2016 at 6:25:27 PM EDT To: Jeffrey Epstein <[email protected]<b7» =div style="font-family:Calibri;font-size:11pttext-align:left;border-wid=h:lpt medium medium•border-st le:solid none none addin :3 t 0in 0in•borde=-to -colorrgb(181,196,223)">From: <mailt Date: on y, , a : To: Richard Kahn Cc: Brice Gordon wave Rumore Peter Cappiello " " Walter Tanner Chris Cappiello Subject: RE: Zorro Ranch / CenturyLink Q=ote I hope all is well with you.=/u> Per our discussion last week we have finalized our design =or this project to support the requested 1 GBPS solution from Day 1. The incremental cost from 300 MB to 1 GB is all related to software licensing =osts on this solution and is negligible to the total project. On that basi= we just designed this to 1 GBPS day one. 3 EFTA_R1_01570513 EFTA02463497
<= class="MsoNormal"> I have=attached the link design for you and have provided a summary below. =/span> Within this plan we would order the required equ=pment (2 links + 1 spare set) and licensing (3 links) to expedite the deli=ery of service. If we were to try and break this into PLAN A and PLAN B it could =elay things by a whole order of magnitude and increase your cost by more t=an the extra FCC license cost we are putting in day 1 ($4k investment to s=reamline the project). By taking this approach we can speed up the deployment timeline and cover all our ba=es so that when we come out to do the install we have the solution in plac=. 1. Primary Link Design 4> Sandia Crest to Main Residence * 4P * i. 11 GHz with 4' antennas <=pan style="font-style:normal;font-variant:normal;font- weight:normal;font=size:7pt;line-height:normal;font-familyfTimes New Roman'"> 40 * . NOTE: If this "Primary S=lution" is successful you would have 1 extra set of spare equipmen= (2 total), as the second link from ZDC Main to Main Residence would not be used.</=> 2. Secondary Link Design a. Sandia Crest to ZDC 40=ACI * 40 i. 11 GHz with 4' antennas b=4) ZDC Tower to Main Residence 40 * 4 i. 11 GHz with 2' antennas <=pan style="font-style:normal;font-variant:normal;font- weight:normal;font=size:7pt;line-height:normal;font-family:limes New Roman"5 * l> * ii. NOTE: if we were to go with seco=dary solution based upon the primary solution not working from a line of site perspective, you would have 1 set of spare equipment. Quote Assumptions: 1. 4, Travel costs — all travel costs (Flights, car rentals, hote=) to be billed back to customer at cost +15%</=> 2. Shipping costs — all shipping costs to be billed back to cu=tomer at cost +15% 4 EFTA_R1_01570514 EFTA02463498
3. * Permitting — the end user will handle any necessary permits=(if required) 4. * Consumables — the attached quote is an estimate and will be=verified based upon site survey <=pan>5.Site Readiness — FT assumes that the sites have tower space= cabinet space for power supplies, power available and switch/router in pl=ce to take receipt of service Sequence of Eve=ts: 1. Week of 4/25/16 a. FT provide quote to Zorro Ranch (4/25/16) b. 4> Zorro Ranch review quote and approve (1-2 days) c. 4> Future Tech to start the FCC licensing process=/span> * * * i. Upon written approval of quote=/u> * 40 * ii. Process will take 1 week to get =nitial channels assigned * *40 iii. Entire licensing process will t=ke 4.5 weeks d. Zorro Ranch issue PO and provide payment (1-2 days)4=pan> 2. Week of 5/2/16 a. FCC provide conditional channel approval 40. 40 40 i. Remaining period of time is just =aperwork process to finalize license b. Future Tech order equipment based off of conditional channel approv=l to get order in process * 40: * i. 4.6 week lead time after receipt =f order 3. * Week of 5/9 or 5/16 a. Future Tech to conduct Field Site Survey 4. Week of 5/23 a. Future Tech to complete field report b. 4> Future Tech to order consumable materials based upon field report EFTA_R1_01570515 EFTA02463499