From: Richard Kahn .t > Sent: Tuesday, October 24, 2017 12:02 AM To: Jeffrey Epstein Subject: 71st - 6th floor Richard Kahn HBRK Associates Inc. 575 =exington Avenue, 4th Floor New =ork, NY 10022 tel fax cell Begin forwarded message: From: =/b>Richard Kahn Subject: =/b>Fwd: 6th =loor Date: =/b>October 23, 2017 at 7:52:02 PM =DT To: =/b>Merwin Dela cruz who did wiring? please find out if it is 4k thank =ou Richard Kahn HBRK =ssociates Inc. 575 Lexington Avenue, 4th =loor New York, NY 10022 tel fax cell Begin forwarded message: From: Al Buonanno Subject: RE: 6th floor EFTA_R1_01747252 EFTA02575747
Date: October 23, 2017 at 7:41:23 PM EDT To: Richard Kahn Cc: Merwin Dela cruz Hello Richard, <mailto Wiring from the =rojector to the equipment rack could possibly take two men a full day =nd may require cutting holes in the ceiling. I cannot absorb that =ost. If you like I will requote with the worst case scenario =roviding ample cost for rewiring. Patching and painting will not =e included. We were not involved in =he original installation and have no knowledge of the existing wiring =athway/conduit. If there is a conduit in place and the wires can =asily be pulled through then that would mitigate the scenario =bove. It would still require additional time. Thank you, Al From: Richard Kahn (mailto Sent: Monday, Oc To: Al Buonanno Cc: Merwin Dela cruz < Subject: Re: 6th floor thank you for explanation boss will proceed =ith turn key solution but will not pay for additional wiring =osts.. i believe your quote has enough cushions =o absorb wiring costs.. please let me know =ow you want to proceed thanks Richard Kahn HBRK Associates Inc. 575 Lexington Avenue, 4th Floor New York, NY 10022 fa ce On =ct 23, 2017, at 7:30 PM, Al Buonanno =rote: Hello Rich and Merwin, Basically that means =hat if there is a problem with the wiring to the projector then that =ork is additional. It can be by another vendor or by Clarity for =nd additional fee. 2 EFTA_R1_01747253 EFTA02575748


