We've located a power meter on St. Thomas that we can use. We can install it when we come down in January. Jeff Jeff Ottaviano Toshiba International Corporation 200 Dryden Road, Suite 3400 Dresher, PA 19025 http://www.toshiba.co.ipisisienisolar/index.htm From: Jeanne Brennan Sent: Saturday, December 08, 2012 9:39 AM To: Ottaviano, Jeffrey Subject: RE: LSJ Solar Thanks From: Ottaviano, Jeffrey Sent: Saturday, December 08, 2012 10:04 AM To: Subject: Re: ISJ Solar Jeanne, I'll look into getting a power meter. We would install it on the 480 V side of the xfmr to include the line and xfmr losses in the readings. We would compare the temporary power meter to the utility meter, thus it would be a time and use study. This would be very valuable information to have to properly size the solar and energy storage system. I should know my schedule for the week of January 7-11 by next week. Jeff From: Jeanne Brennan Sent: Saturday, December 08, 2012 06:53 AM To: Ottaviano, Jeffrey Cc: EFTA_R1_00027541 EFTA01739145