Item,* Betteroads Asphalt Corporation lISIIIIIIMThomas, VI 00803 Date: 9/24/2013 Price Quote: For Little St. James-For Asphalt 595 Sy Description Unit g. Nos. Unit Price Words Unit Price Total ($) Mobilization LS 1 $6,000.00 Six Thousand Dollars $6,000.00 Aggregate Base Materials Crusher Run Cy 35 590.00 Three Thousand One Hundred and Fifty Dollars S3,150.00 Fine Grading, Cleaning and Haul Debris to Dump Site Ls Asphalt Surface Mix 2.5 Tons 85 5325.00 Twenty Seven Thousand Six Hundred Dollars S27,625.00 Milling Sy Tack Oil Gals 40 $15.00 Six Hundred Dollars $600.00 Traffic Control 8, Signs Ls Total (Numbers) Total (Words) Contractor's Name Contractor's Signature Thirty Seven Thousand Three Hundred and Seventy Five Dollars Betteroads Asphalt Corporation $37,375.00 EFTA_R1_01947511 EFTA02672940