From: Jeffrey Epstein <[email protected]> Sent: Monday, February 22, 2010 5:42 PM To: Stephen Caplinger Subject: Re: Office Pavilion Entry Site Plan the road has a focus of the steps. that can't be.. the corner where you=make first right is awkward. On Mon, Feb=22, 2010 at 12:38 PM, Stephen Caplinger wrote: Attached=is an updated site plan for the Office/Master Bedroom area. This pla= does not have a roadway connection all the way around as in the previous plans. <=span> This is = "flat terrace" plan and the main terrace area is the same width as the master bedroom building. The stai=way has been moved more to the west. The lowe= courtyard in front of the office breezeway has been enlarged and the walls are approxima=ely 6' ht. All wall= are flat & stepped instead of being sloped. Also, I =ave shown the new stair & walk connection from the kitchen. Please r=view and let me know if you have any thoughts. I'm al=o sending to Andrew and he can do a SketchUp 3D drawing if you think it's ready for that step. We also =ill stake it out in the field for your next visit. Regards,=/span> STEPHEN M. CAPLINGERaspan> Vice President Design =amp; Planning LANDMARK LAND COMPANY<=span> 4908 Brooksview Circle New Albany, Ohio 43054 1 EFTA_R1_01670312 EFTA02528586
=a> <mailto:[email protected]> The information contained in this c=mmunication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the a=dressee. It is the property of Jeffrey Epstein Unauthorized use, di=closure or copying of this communication or any part thereof is strictl= prohibited and may be unlawful. If you have received this communication in error, p=ease notify us immediately by return e-mail or by e-mail to [email protected], and destroy thi= communication and all copies thereof, including all attachments. 2 EFTA_R1_01670313 EFTA02528587


