From: Daphne Wallace Sent: Wednesday, July 1, 2015 8:29 PM To: Jeffrey Epstein Cc: ann rodriquez; Rich Kahn Subject: Pre-fab Building bids - July 1, 2015 Greetings Sir, I contacted J=redian to confirm that the scope of work they submitted for the structural=steel buildings they designed for the RO Garage roof and the proposed New =echanical Building were suitable for the 80 by 80 building that you have r=quested bids for. John advised that an 80 foot wide building would not fi= on the sight - we presumed you are proposing to place this building where=the current Buck Steel building sits - due to space restrictions. The buil=ing they designed has a maximum width of 74 feet. To increase to 80 =eet you would have to excavate into the driveway leading to the Iguana cro=sing and to your Main compound driveway. They avoided this area beca=se of the electrical and other underground infrastructure that runs under =hat driveway. Do you wish for me to proceed, as you requested, with obtain=ng quotes for an 80 by 80, or do you wish to reduce to 74 by 80? Respectfu=ly, Daphne 1 EFTA_R1_01386481 EFTA02376654


