From: Amy Dempsey < Sent: Wednesday, March 6, 2019 12:23 PM To: Jeffrey Epstein Subject: Status It =s probable that Jonathon Pempek USACE will be coming down on the 11th.Q USACE regulatory has been giving him some push back on processing of th= dock permits(and on several other non compliances he has settled). = will be talking to him about what needs to be done to get things moving f=rward again. I know CZM had raised issues on the applications and th= temporary ramps. Has there been a resolution? I want to check=on what is happening but did not want to stir the pot so to speak if a res=lution is in the process. On the cable side we are less than a month away from both the CZM permit =nd the USACE permit. Amy Claire Demp=ey, M.A. President, Bioimpa=t, Inc. P.O. Box 132 Kingsh=ll St. Croix, U.S. Vir in l=lands 00851 </=iv> 1 EFTA_R1_01852821 EFTA02632004

