From: jeffrey E. <[email protected]> Sent: Wednesday, July 1, 2015 9:56 PM To: Daphne Wallace Subject: Re: Pre-fab Building bids - July 1, 2015 74 On Wed, Jul 1, 2015 at 10:28 PM, Daphne Wallace mailto > wrote: Greetings Sir, I contacted Jaredian =o confirm that the scope of work they submitted for the structural steel b=ildings they designed for the RO Garage roof and the proposed New Mechanic=l Building were suitable for the 80 by 80 building that you have requested=bids for. John advised that an 80 foot wide building would not fit on the =ight - we presumed you are proposing to place this building where the curr=nt Buck Steel building sits - due to space restrictions. The building th=y designed has a maximum width of 74 feet. To increase to 80 feet yo= would have to excavate into the driveway leading to the Iguana crossing a=d to your Main compound driveway. They avoided this area because of =he electrical and other underground infrastructure that runs under that dr=veway. Do you wish for me to proceed, as you requested, with obtaining quo=es for an 80 by 80, or do you wish to reduce to 74 by 80? Respectfully, Daphne please =ote The information contained in this communication is confiden=ial, may be attorney-client privileged, may constitute inside informati=n, and is intended only for the use of the addressee. It is the propert= of JEE Unauthorized use, disclosure or copying of this communica=ion or any part thereof is strictly prohibited and may be unlawful. If =ou have received this communication in error, please notify us immediat=ly by return e-mail or by e-mail to [email protected] <mailto:jeevacation@gmail=com> , and destroy this comm=nication and all copies thereof, including all attachments. copyright -=11 rights reserved EFTA_R1_01622136 EFTA02497256
