From: Richard Kahn < Sent: Friday, September 7, 2018 5:25 PM To: jeffrey E. Subject: Prosolar another situation whereby no follow up / concern? solar down since early wednesday am and only now when i ask =s brice following up with =1 leads me to believe no one has stayed on GSJ =ince Glidden left last week.. Richard Kahn HBRK Associates Inc. Er" Begin forwarded message: From: =/b>brice Subject: =/b>Re: Friday June =9th Date: =/b>September 7, 2018 at 1:22:27 PM =DT To: =/b>= ...weird and disturbing Cc: =/b>Dan Prosolar < >, Marcelo < >, Brian Walden < >, Brad Spernak < >, michael glidden < >, =ichard Kahn < <mailto > > Please advise if solar grid is =aintaining load on GSJ Thank you Sent from my iPhone EFTA_R1_01832121 EFTA02623261
On Sep 7, 2018, at 10:54 AM, Richard Kahn < > wrote: is solar back up? if so =lease advise what issues were.. thank =ou Richard Kahn HBRK Associates Inc. 575 =exington Avenue 4th Floor New York, NY 10022 fax cell On Sep 5, 2018, at 7:22 AM, brice Morning Same =ssue no power again Sunny islands =ead Sunny boys flashing =ellow Please as to what you would like to =o Brice Sent from my iPhone > wrote: On Sep 4, 2018, at 12:11 PM, Dan Prosolar < > wrote: good morning all! hope =veryone had a great weekend.. minus GS.I with no power. i feel very good about my visit today. i was =eceiving error codes pertaining to an OVER- VOLTAGE situation. this is =reat news considering we have been fighting the opposite problem since =he hurricanes. i have had the system set to perform at the absolute =eek voltage it can to avoid loosing power. this maximum voltage setting =eeters the system on the edge of its capabilities. as we see now it has =btained and exceeded its voltage setting limits on the sunny islands. =here is no damage done, only the inconvenience of it shutting down to =rotect itself. Today i throttled back the target voltage by lv. this =hould prevent more shutdowns due to over voltage. i think we have got =his system dialed in. All the best, Dan Chrisman 2 EFTA_R1_01832122 EFTA02623262
On Mon, Sep 3, 2018 at 6:57 PM, brice <mailto » =rote: Good Evening The solar system is down on GSJ No power =unny islands Sunny boys seem to be in =farm Cluster box no power Please advise as to Dans schedule Regards =rice Sent from my =Phone =erformed on his last visit to GSJ. On Jul 11, =018, at 2:10 PM, Marcelo < Good afternoon Richard, > wrote: Please =ee the below email containing Dan's summary of what actions he Regards, =/span> Marcelo =erez Project Manager www.prosolaramerica.com From: Dan Prosolar <mailto Sent: =/b>Wednesday, July 11, 2018 1:10 PM To: =/b>Marcelo <mailto Subject: Re: FW: =riday June 29th 3 EFTA_R1_01832123 EFTA02623263
Good =fternoon all, sorry for the delay my email had an issue and became =nlinked so I wasn't receiving these untill now. Regarding 651 =ere is what's been achieved. -all Aquion battery =odules are wired to bypass the corroded, water damaged circuit boards =hat could interfere with charging profiles. -sunny islands (6) =ere downgraded to firmware version 6.0.02. This was done to allow a =roader, linear charge profile to be set -charging parameters =re now based on voltage set points rather than state of charge =alculations done internally with different references. -max charge voltage =as been set to 58.5V and the batteries will not stop charging untill a =oltage 1.5V over the set limit is a achieved for 15 seconds. This gives =hem the ability to serpase the previous charge voltage of 56.7V - the main issue =hat caused so much down time before was as follows. A target charge =oltage that matched the Aquion batteries was not possible with the =revious profile. Compiled on that was faulty Aquion circuit boards =reventing the batteries from properly charging to a suitable voltage. =quion, as we know, is no more, so it's impossible to obtain =eplacement parts. Aquions bms never met the as advertised performance =nd created more issues than we could have imagined. In short, the =hanged I made allowed for a higher, more suitable battery voltage to be =chieved and prevents the premature shut down we saw before. Again, sorry for the =elay, hope all is well Thanks Dan Chrisman Senior Technical =pecialist Prosolar=LLC 4 EFTA_R1_01832124 EFTA02623264
<mailto > wrote: From: Richard Kahn <manta Sent: =/b>Wednesday, July 11, 2018 10:30 AM To: =/b>Brian Prosolar <mailto Cc: Brad=Spernak; michael glidden <mailto Subject: Re: Friday June 29th can we do thursday morning or anytime friday when can expect =an's summary? please =dvise thank =ou Richard Kahn HBRK =ssociates Inc. 575 Lexington Avenue 4th Floor New York, NY 10022 cell On Jul =0, 2018, at 2:18 PM, Brian Prosolar < Afternoon =ichard, >; Brice Brad is traveling to =an Francisco for a conference and I'm boarding a plane to STX. ='ve asked Dan to write a synopsis of his efforts and we have =een monitoring for proper function. I'll relay this tomorrow =nce he's finished. We're still =valuating but all is functioning as intended for the moment. Additional =onitoring and confirmation are needed since the weather over the last =eek has been extremely cloudy. Would it be possible =o have our call on Thurs. afternoon at 3 EST? 5 EFTA_R1_01832125 EFTA02623265
Regards, Brian Walden ProSolar America, lIc Director of =perations On Jul 10, 2018, at 1:50 PM, Richard Kahn =lt <mailto: > wrote: i have =ot yet heard back from anyone on a time to speak please advise thank you Richard Kahn HBRK Associates Inc. 575 Lexington Avenue 4th Floor New York, NY 10022 cell On Jul =, 2018, at 5:36 PM, Richard Kahn < > wrote: can we please =rrange a call for tomorrow to review current status of GSJ solar thank you Richard Kahn HBRK Associates Inc. 575 Lexington Avenue 4th Floor New York, NY 10022 6 EFTA_R1_01832126 EFTA02623266
cell On Jun =9, 2018, at 1:36 PM, Brian Prosolar < wrote: Afternoon =ich, I =elieve the normal boat arrival time is 8 or 8:30 a.m. in Redhook. =nbsp; Dan =ill be there. Regards, Brian Walden ProSolar America, =lc Director of =perations On Jun 29, 2018, at 1:20 PM, Richard Kahn =lt <mailto: > wrote: please =onfirm what time you will be arriving at GSJ on Monday thank you Richard Kahn HBRK Associates Inc. 575 Lexington Avenue 4th Floor New York, NY 10022 7 EFTA_R1_01832127 EFTA02623267
cell On Jun =8, 2018, at 1:42 PM, Brian Prosolar < wrote: Afternoon Richard, We're still =rying to have a final discussion with Stefan as well as track down =ultiple 128MB or smaller SD cards to reboot the Sunnyboy inverters. =e're moving as quickly as we can in order to execute the =onversion plan but it looks like we have to push to Monday. Dan has =hown Michael how to get the system back up and operating in the event =f it dropping offline and that is working for the interim. Regards, Brian Walden c. On Jun 28, 2018, at 11:08 AM, Richard Kahn =lt <mailto > wrote: please =onfirm that you will be at GSJ tomorrow to work on the Solar thank you Richard Kahn HBRK Associates Inc. 575 Lexington Avenue 4th Floor New York, NY 10022 8 EFTA_R1_01832128 EFTA02623268
On Jun =5, 2018, at 7:27 PM, Brian Prosolar < wrote: I want to ensure we have the PCB bypass discussion with the =ngineers prior to the visit and will try to expedite. Brian Walden EE/RE Consultant On Jun 25, 2018, at 5:05 PM, Richard Kahn =It <mailto: > wrote: we are =ithout any solar currently can you please try to have dan come sooner thank you Richard =ahn HBRK Associates Inc. 575 Lexington Avenue 4th Floor New York, NY 10022 On Jun =5, 2018, at 4:31 PM, Brian Prosolar < wrote: Afternoon =ichard, I have Dan on the =chedule to head to GSJ on Friday. Regards, 9 EFTA_R1_01832129 EFTA02623269
Brian Walden ProSolar America, =lc Dir. =f Operations On Jun 25, 2018, at 3:30 PM, Richard Kahn =lt <mailto: > wrote: can you please advise when your men can come =n and fix our solar system thank you Richard Kahn HBRK Associates Inc. Er" <401A334B18B040D0BBA29AA3089AB844(4315691.jpg> <=div> 10 EFTA_R1_01832130 EFTA02623270