From: Kyle reavis < Sent: Friday, September 28, 2018 1:08 PM To: jeffrey E. Cc: brice gordon; Richard Kahn Subject: Barge Ramp Mr Epstein, Dupson is finished with the=dock apron and I wanted to confirm we will have him move onto the barge ra=p next. He will need to collect stone= over the next few days for the ramp. The design to confirm is to ma=ch the dock apron visually. Do you want any boarders like on the dock apro=? The process will be as follows; <=div> -Collect stones -Jack-Hammer up stones (2" removed=from surface) -Stone Facade- this will be set on top of rough su=face, we will be using a bonding agent (most likely Intralock) to bond the=new cement to the set concrete to add more compression strength for the li=e loads coming off the barge We can do a sm=ll section first if you would like. Please let me know what you thin=. Thank you!! Very Respectfully, =br> Kyle Reavis 1 EFTA_R1_01828669 EFTA02621650