From: 1 <[email protected]> Sent: Friday, October 19, 2018 9:36 PM To: Brice; Rich Kahn Subject: Fwd: ABSOLUTELY NOT . He is a total incompetent! I =anted johns doc and he was only asked to provide them ! =/div> Forwa=ded message From: Daphne Wallace .: 1> Date: Fri, Oct 19, 2=18 at 4:54 PM Subject: Re: To: John P. Woods, AIA, NCARB </riv> Greetings John, Following u= on the discussion regarding changes for the Mechanical/R0 building roof a=d Engineering area projects, the proposal is to change the buildings from =re-fabricated sheathing to concrete block, retaining the steel framework.<=div> It has also been proposed to eliminate the pre-fab=icated building altogether for concrete and concrete block. =/div> Please let me know if this is your understanding of discussions =ou have had recently with Brice, and what Mr. Epstein requested yesterday.=/div> I will look out for your email of the original dr=wing and proposals on Monday. Have a great weeken=, Daphne On Thu= Oct 18, 2018 at 6:10 PM Daphne Wallace > wrote: Greetings Sir, =div>l just spoke with John. He will forward the original design draw=ngs by Monday. He will also prepare a proposal for the changes - mec=anical, electrical and structural wall - that Brice requested. Cr> John stated further that the structural steel design still ne=ds to be done. The original design is based upon a pre- engineered st=el structure. Respectfully, <=iv>Daphne On Th=, Oct 18, 2018 at 4:44 PM J <[email protected] <mailto:[email protected]> wrote: EFTA_R1_01822310 EFTA02618523
?? did not receieve t=e plans ? conversation-id 324723 date-last-viewed 0 date-received 1539984987 flags 8590195713 remote-id 864105 2 EFTA_R1_01822311 EFTA02618524



