From: Sent: To: Subject: Thank you Sent from my iPhone brice gordon sommu > Sunday, November 11, 2018 6:17 PM J Re: LS1 RO Fiber On Nov 1=, 2018, at 9:21 AM,1 <[email protected] <mailto:[email protected]» wrote: ok On Sun, Nov 11, 2018 at 11:11 AM brice gordon •; => wrote: =div class="gmail_default" style="font•size:small">Hello Rich =div class="gmail_default" style="font-size:small"> Cost:$2753.69 Rogers Electric for Conduit. </=iv> Cost:$7520.43 plu= shipping adiv> Estimated Cost: $=0,274.12 <=r> We are unable to Pull New Fiber in the the Existing Conduit &n=sp;from the Intake Pump Controls. The fiber=connection allows the RO Plant to communicate to Pumps=located outside the Tunnel. The conduit is for the Duct Bank, to b= dug from the Generator Building out &nbs=;with a new feeder for GSJ. At this time the Sea Water Intake pum=s are being run in Manual Mode. LSJ will Dig, Install conduit and=Pull Fiber. Can we proceed with ordering Fiber and=Conduit? regards Brice Gordon The Saint lames Group USVI Ph: </=iv> Generator Building to Sea Water the Sea Water Intake to the Sea Water Intake building, EFTA_R1_01813001 EFTA02614532
&nb=p; please note The information contai=ed in this communication is confidential, may be attorney-client privile=ed, may constitute inside information, and is intended only for the u=e of the addressee. It is the property of JEE Unauthorized use, discl=sure or copying of this communication or any part thereof is strictly pr=hibited and may be unlawful. If you have received this communication i= error, please notify us immediately by return e-mail or by e-mail to [email protected]=m <[email protected]> , and destroy this communication and all copies thereof, includi=g all attachments. copyright -all rights reserved 2 EFTA_R1_01813002 EFTA02614533
