To: J Epstein[jeevacationcgmail.com] From: Brice Gordon Sent: Thur 5/14/2009 6:45:13 PM Subject: Re: Title: Re: There is a sub floor installed already and once millwork install occurs then finish floor samples along with stain selection will be forwarded to you. I confirmed this with Tom M last week. Once millwork is installed there is still; some final finish work that needs to be done and the floor will be the last thing to be installed. Millwork will be protected. On 5/14/09 12:15 PM, "Jeffrey Epstein" <[email protected]> wrote: what about a floor, how are we putting cabinets in with no floor.. doug EFTA_R1_01517468 EFTA02442455